comments on: how to build a lookahead filter in primavera p6 - 瑞士vs喀麦隆足彩赔率 //www.deco-dalles.com/build-lookahead-filters-primavera-p6/ project controls training & courses tue, 19 jul 2022 19:05:12 +0000 hourly 1 by: william hill promotion //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-93187 tue, 19 jul 2022 19:05:12 +0000 //www.deco-dalles.com/?p=979#comment-93187 by: elyar safarov //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-84986 tue, 11 may 2021 08:06:27 +0000 //www.deco-dalles.com/?p=979#comment-84986 in reply to elyar safarov.

is “in progress” (global) filter enough for this?

]]>
by: elyar safarov //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-84985 tue, 11 may 2021 07:52:30 +0000 //www.deco-dalles.com/?p=979#comment-84985 hi, michael!
hope you are good.

i have project (really big) and i need to set up a filter to see only activities that are on data date. without certain timeframe like dd-1m or dd+4m. as there are a lot of activities that have long duration as well as short duration. for example: if i put filter dd-5m and dd+5m this will also show what are ending (or starting) less than this period.
how you can help me to set a filter only for activities that are exactly on data date? all that started before and all that will finish after; basically all activities are currently go through the data date.

thanks a lot in advance.

bet regards

]]>
by: mohamed ayman mohamed shaheen //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-75854 thu, 14 nov 2019 12:30:56 +0000 //www.deco-dalles.com/?p=979#comment-75854 i think will not be more accurate if i have out of sequence activity which start already and remaining work will resume after the period of the the look ahead – it will shown in filter and should be not shown

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-74927 wed, 06 feb 2019 21:27:11 +0000 //www.deco-dalles.com/?p=979#comment-74927 in reply to ajinkya s ghongade.

i recommend you follow the steps in the tutorial to provide some guidance. you can simply add another filter for the wbs.

]]>
by: ajinkya s ghongade //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-74900 tue, 29 jan 2019 08:32:03 +0000 //www.deco-dalles.com/?p=979#comment-74900 hi, i want create a 6 weeks lookahead filter under a specific wbs. i need to add following things:
1. activity start should be within dd+6w
2. activity finish should be within dd+6w
3. all activity in progress status

]]>
by: walid //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-69072 wed, 26 dec 2018 03:41:30 +0000 //www.deco-dalles.com/?p=979#comment-69072 thank you is very important

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-57937 wed, 02 may 2018 17:21:49 +0000 //www.deco-dalles.com/?p=979#comment-57937 in reply to xudong sun.

sun, it looks like both of those will work. i think you’re suggesting the 2nd one is simplier, to which i agree.

]]>
by: xudong sun //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-57909 wed, 02 may 2018 03:27:21 +0000 //www.deco-dalles.com/?p=979#comment-57909 in reply to michael lepage.

dear michael,

here’s my stupe question:

during with parallelly fitter of “status is not equal to completed”
what is the different between “start date whthin ps to dd+1m ” and “start date less than dd+1m ” ?

thanks a lot.

regards,

sun

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-55559 tue, 13 feb 2018 18:45:26 +0000 //www.deco-dalles.com/?p=979#comment-55559 in reply to parwezqasimy.

well, we recommend you update your project regularly, but how often is up to you. if you update to feb 10 and move the data date to feb 10, then your 3 week lookahead will start from feb 10. if you want to build the lookahead from today’s date, just change dd to cd in the filter equations.

]]>
by: parwezqasimy //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-55525 tue, 13 feb 2018 04:32:08 +0000 //www.deco-dalles.com/?p=979#comment-55525 dear my project start from 6 january-18 and finished in 16may-18, i wana make 3weeks lookahead and now is 10 february-18
the first its necessary for me at which date i update my schedule (my update must be 10 february or no up to dd+3w)
i deeply appreciate your support.
with warm regards,

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-54628 tue, 16 jan 2018 01:39:15 +0000 //www.deco-dalles.com/?p=979#comment-54628 in reply to jafar.

where start is within range of “13-jan-18” and “26-jan-18”. you could also try to use the current date (cd) (today’s date), which would be:
where start is within range of “cd” and “cd+2w”.

]]>
by: jafar //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-54542 sat, 13 jan 2018 06:46:30 +0000 //www.deco-dalles.com/?p=979#comment-54542 dear i want to know that..i was working with time schedule without updating..project start is 7 nov-17 and now current date is 13-jan -17 ..how i get the 2 week look ahead without keeping dd+2w…any other solution to get the look ahead program from 13 jan 18??

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-44798 wed, 03 may 2017 11:14:54 +0000 //www.deco-dalles.com/?p=979#comment-44798 in reply to elgart.

that’s a tough one. there’s no easy way that comes to mind. once you update a bunch of activities and then reschedule, the entire schedule is different. so going back to uncover activities that were updated is difficult. my recommendation here would be to
1) ensure you make a backup copy of your schedule before you perform an update.
2) use a tool like change inspector to compare the updated schedule to previous version to see the difference. claim digger (now called schedule comparison) could also work. but i very much like change inspector.

]]>
by: elgart //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-44788 wed, 03 may 2017 07:03:25 +0000 //www.deco-dalles.com/?p=979#comment-44788 hi michael,

i have updated my programme for this week’s progress update, please let me know how i can filter the activities that i have touched or updated within this period only. thanks a lot

elgart

]]>
by: prasad //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-40128 mon, 01 aug 2016 10:23:12 +0000 //www.deco-dalles.com/?p=979#comment-40128 thank you for the tutorial

]]>
by: sajid //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-38882 sat, 07 may 2016 12:47:39 +0000 //www.deco-dalles.com/?p=979#comment-38882 dear mr. michel,
please help me create a look ahead filter that can also include in progress activities, which are planned beyond dd+1m. i mean there are some activities in the schedule which are planned let’s say dd+3m but started earlier.

i hope my question is clear.

]]>
by: akbar //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-37777 wed, 10 feb 2016 06:41:10 +0000 //www.deco-dalles.com/?p=979#comment-37777 rolling 5 week schedule

thanks for the tutorial it is very easy to learn from your screenshots.

1) i would like to know how can we develop 5 weeks rolling schedule?

2) it will be very grateful if you also teach how to develop a manpower report based on activity codes. (meaning i have zonal split in activity code and would like to get a report based on zone)

thanks in advance

]]>
by: khuong //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-37664 thu, 04 feb 2016 07:12:15 +0000 //www.deco-dalles.com/?p=979#comment-37664 this is a very useful article.

]]>
by: olabode //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-35532 fri, 27 nov 2015 22:16:10 +0000 //www.deco-dalles.com/?p=979#comment-35532 thank you so much! this is very helpful, am new into project scheduling and i hope to learn more as i progress. once again, thank you.

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-31431 fri, 28 aug 2015 11:19:24 +0000 //www.deco-dalles.com/?p=979#comment-31431 in reply to andrew arvans.

andrew. for this you could create a filter like: where actual finish is within range of (dd-1m to dd). this will show all activities that finished in the month before the data date. it’s a dynamic filter as well. try that.

]]>
by: andrew arvans //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-31371 thu, 27 aug 2015 22:21:38 +0000 //www.deco-dalles.com/?p=979#comment-31371 michael lepage,

your tutorial is great! it helped me a lot. however i was hoping you could help with something else. the client for our project also likes to know what activities were completed within a month of the data date.

i can create a filter that shows all the completed activities but not one that will only show activities that were completed within a month. do you know how to create this?

]]>
by: ako //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25651 thu, 19 mar 2015 10:28:32 +0000 //www.deco-dalles.com/?p=979#comment-25651 in reply to femi wuyi.

femi,

you are very correct. i do hope he reads and understands that training is very important.

regards,

ako

]]>
by: ako //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25650 thu, 19 mar 2015 10:27:01 +0000 //www.deco-dalles.com/?p=979#comment-25650 in reply to saeed.

sayeed,

i think you really need to follw a complete primavera p6 course/training to be able to prpare a master schedule for a project that big.

read this an an advise.

ako

]]>
by: femi wuyi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25457 wed, 11 feb 2015 19:26:09 +0000 //www.deco-dalles.com/?p=979#comment-25457 hi michael,

i got the same message from saeed, and i told him the best thing he can do. no planner will like to release his schedule just like that.

planning profession is not a day work. to become a competent or outstanding planner, many years must have been spent in the field of planning.

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25453 wed, 11 feb 2015 18:54:42 +0000 //www.deco-dalles.com/?p=979#comment-25453 in reply to saeed.

i’m sorry sayeed, i have no project schedule that i can share. most of the time, the schedule belongs to a client, and it’s not usually in their best interest to share a schedule that cost them a lot of time and money to create. however, ask around on linkedin and you might get a different response, but ensure you are gracious in asking.

]]>
by: saeed //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25422 thu, 05 feb 2015 12:56:42 +0000 //www.deco-dalles.com/?p=979#comment-25422 dear sir,

thank you very much for your help.

my company has won a contract of a shopping mall & i am asked to prepare the master schedule.

can you help me sending some example program’s with some set of activities.

thank you in advance.

regards,
saeed

]]>
by: femi wuyi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25372 sat, 24 jan 2015 10:16:57 +0000 //www.deco-dalles.com/?p=979#comment-25372 in reply to saeed.

saeed,

my e-mail is phemmywuyi07@yahoo.com

thanks

]]>
by: saeed //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25370 sat, 24 jan 2015 04:19:47 +0000 //www.deco-dalles.com/?p=979#comment-25370 dear sir,

thank you very much for your instant reply.

i would really appreciate if you can send me the screenshots.

thank you very much again.

]]>
by: femi wuyi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25369 fri, 23 jan 2015 16:11:54 +0000 //www.deco-dalles.com/?p=979#comment-25369 in reply to saeed.

go to the filter, click on add, then rename your filter as look ahead 3m from dd & look back 1m from dd.

click on add, and select all the following.

under the parameter add, “start”, under is, add “is within range of”, under value add “dd-1m”, under high value add “dd+3m”

add another row, under parameter add, “activity status”, under is add “is not equal to”, under value add “completed”.

then click ok and you have your result.

i hope this help.

thanks.

if you want the screen shots, you can send me an e-mail

]]>
by: saeed //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25368 fri, 23 jan 2015 08:50:59 +0000 //www.deco-dalles.com/?p=979#comment-25368 dear sir,

how to get a 3m look ahead schedule 1 month before the data date.

please help me… i am very new to primavera.

thank you very much in advance.

]]>
by: burhan //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-25255 sun, 21 dec 2014 18:40:24 +0000 //www.deco-dalles.com/?p=979#comment-25255 i truly appreciate the effort, the way of tutorial, specially the interactive one.
i thank you for good work.

]]>
by: plannertuts //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24996 tue, 11 nov 2014 18:21:48 +0000 //www.deco-dalles.com/?p=979#comment-24996 in reply to dhyaa.

follow the step above. replace 3w with 1w.

]]>
by: dhyaa //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24994 tue, 11 nov 2014 13:11:21 +0000 //www.deco-dalles.com/?p=979#comment-24994 dear gentlemen
please can you help me, i want to create one week lookahead filter.

thanks!
dhyaa jibber

]]>
by: plannertuts //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24876 tue, 28 oct 2014 13:58:49 +0000 //www.deco-dalles.com/?p=979#comment-24876 in reply to prashant k singh.

many thanks prashant!

]]>
by: prashant k singh //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24864 mon, 27 oct 2014 12:40:02 +0000 //www.deco-dalles.com/?p=979#comment-24864 dear sir,

sorry for the late reply. thanks for your insight . your articles & comments always plays a big role in better understanding of primavera

regards

prashant

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24792 mon, 20 oct 2014 17:38:39 +0000 //www.deco-dalles.com/?p=979#comment-24792 in reply to prashant singh.

pashant, typically, you would not use the baseline, but rather the updated schedule. since the updated schedule provides a forecast based on what actually happened, then you’ll want to report on anything that is starting late or early in the lookahead report.
michael

]]>
by: prashant singh //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-24777 mon, 20 oct 2014 07:23:30 +0000 //www.deco-dalles.com/?p=979#comment-24777 hi,

plz let me know for three months look ahead schedule whether we should use the baseline for predicting the 3 months look ahead or we should use updated schedule as on date

kindly advice
regards
prashant

]]>
by: victor //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-23834 sun, 14 sep 2014 18:04:29 +0000 //www.deco-dalles.com/?p=979#comment-23834 i am having a problem in p6 ver 6.2 i have created wbs and assigned to all activities. but when i go to group and sort and choose wbs i am not able to uncheck hide if empty as it is displayed in a not editable way. i just cannot check or u check. also indent is not working. when i select level in the drop down it is not appearing.
please help
regards
victor

]]>
by: sooja bos //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-21700 wed, 13 aug 2014 16:20:23 +0000 //www.deco-dalles.com/?p=979#comment-21700 hi,

i am trying to see all the activities coming within a certain time frame say from 11th aug to 27 aug. the data date is 31 july so cannnot take dd as reference. if i apply in progress filter it will take activities from 31 july to 11 aug which i dont want. so how to see all the activities whether starting, finishing or in progress during specific dates as mentioned above?

the approach i am using is
all of the following
start is less than or equal to 27 aug
finsh greater than or equal to 11 aug

please tell me if that is right and captures everything becuase my programme is very big and i could not verify everything line by line.
thanks

]]>
by: mohamed abdul gawad //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12197 tue, 18 feb 2014 18:18:56 +0000 //www.deco-dalles.com/?p=979#comment-12197 the ideal 3 weeks look ahead is as follow:

where remaining early start is within range of dd to dd+3w

the advantage of this filter is:
it will include the activities which will start or in progress during the 3 weeks period

]]>
by: jay //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12196 mon, 11 nov 2013 11:44:05 +0000 //www.deco-dalles.com/?p=979#comment-12196 hi michael,

gone through all the post, you have explained really well.however am facing a problem creating filter for activities occuring in a speciific time frame.

the conditions which i want to satisfy are as below

1) activities which are incomplete
2) activities occuring in a specific timeframe eg:between january 14 to march 14
3) it should include activities which have started before jan 14 and ending after mar 14 and they pass though the above mentioned timeframe.

what am trying to do is i have got a baseline schedule with baseline resource plan and budget.however in the exisiting baseline i want to see if i change the cost of 世界杯时间比赛时间 for a specific time frame what will be the impact on the overall project costing

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12195 wed, 23 oct 2013 20:01:03 +0000 //www.deco-dalles.com/?p=979#comment-12195 @rahul,
i would try remove all 3 activity status lines – essentially you are including all activities with any status, so those lines are not necessary.

try this:
// where start is within range of 10-oct-13 07-nov-13
or
activity status equals in progress //

this says show me the activities that are starting between oct10 and nov 7 + include any activities that are in progress.
m

]]>
by: rahul //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12194 thu, 17 oct 2013 09:22:37 +0000 //www.deco-dalles.com/?p=979#comment-12194 dear sir,

for a 3 week look ahead with data date say 17 oct, i am using filter parameter as mentioned below.

// where start is within range of 10-oct-13 07-nov-13
and (any of the following)
or activity status equals in progress
or activity status equals completed
or activity status equals not started //

but my filter is not giving an activity which starts on 02-oct-13 and having duration 30 days. i have tried giving the activity id also, neither it works. could you please sort out the problem for me please.

]]>
by: femi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12193 thu, 19 sep 2013 16:00:38 +0000 //www.deco-dalles.com/?p=979#comment-12193 dear mike, can i get a copy of tutorials on the followings primavera p6 8.2 topics:
1. spending plan
2. cost account
3. top-down budgeting
4. top-down estimating
5. 世界杯时间比赛时间 leveling

thanks so much for the great work you are doing
thumb-up for you

]]>
by: beatriz eduardo //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12192 thu, 19 sep 2013 15:27:31 +0000 //www.deco-dalles.com/?p=979#comment-12192 thank you for your very informative tutorials. i have a lot a lot from your lesson. i appreciate you.

]]>
by: aladdin fayoumi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12191 tue, 17 sep 2013 13:49:45 +0000 //www.deco-dalles.com/?p=979#comment-12191 dear mr. michael,

i’d like to thank you so much for your great job, i have one question, since i have some activities has been delayed for more than one month, let say started on june 25th, 2013 but still not close and we update the progress in weekly basis, how we can show this activity in our current moth schedule for aug.2013. usually i use filter: start before dd & the activity status not complete; which bring alot of delayed activities from the beginning of project, but i need to show only the on going activities within aug.2013.
one more thing, can i use the spotlight feature to show the on going activity for specific period.

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12190 fri, 23 aug 2013 19:02:39 +0000 //www.deco-dalles.com/?p=979#comment-12190 thank you femi! your feedback is much appreciated.

]]>
by: femi //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12189 mon, 19 aug 2013 14:43:22 +0000 //www.deco-dalles.com/?p=979#comment-12189 you are great, the tutorial was superb, please keep it up

]]>
by: ajith janardhanan //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12188 tue, 23 jul 2013 11:50:15 +0000 //www.deco-dalles.com/?p=979#comment-12188 i found this tutorial a helpful one. i am preparing high level programme. project duration is 4 year. my client is insisting me to give the duration in months. say for example if give the duration as 2 months for an activity starting on 1/1/2014 it should show finish date 1/3/2013. if successor activity is starting on 5/3/2014 with 3 months duration, it should show finish date as 5/6/2014 irrespective of number of days in the month. please help me to solve this issue.

]]>
by: ibraheem //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12187 sun, 30 jun 2013 17:15:09 +0000 //www.deco-dalles.com/?p=979#comment-12187 kudos to you……. i really love the lesson and i learnt something from there…….. thanks boss!

]]>
by: gerardo vilcahuaman e. //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12186 wed, 22 may 2013 22:33:00 +0000 //www.deco-dalles.com/?p=979#comment-12186 good tut michael. i made by myself another filter for 4w lookahead that works really efficiently for me:
1) start is less than or equals to dd+28d
2) finish is greater than or equals to dd+1d

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12185 mon, 15 apr 2013 19:57:46 +0000 //www.deco-dalles.com/?p=979#comment-12185 @k satish – there is a final screenshot in the tutorial and yes, the wbs bars are showing – but the filter will not remove those – only the special “wbs summary” activities if you project has any. this sample project did not have any “wbs summary” type activities to begin with.
warmest regards,
michael

]]>
by: k. satish kumar //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12184 fri, 12 apr 2013 05:28:03 +0000 //www.deco-dalles.com/?p=979#comment-12184 thank you for sharing.

in the interactive kindly include the final screen shot after applying the filter so that i can confirm (myself) the correctness(…i could still see the wbs summary bars!)

]]>
by: plannertuts //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12183 tue, 12 mar 2013 23:46:13 +0000 //www.deco-dalles.com/?p=979#comment-12183 in reply to debasish mitra.

debasish,
this is a bit more complex and i think you are asking to see a list of projects that are currently in-progress and would like to see also what stage they are in. start on the projects page and build a filter there. you might filter on a range of data dates (dd) – where data date is within range of cd-1m (which is current date minus 1 month) to cd+1m (current date + 1 month). try this to see a list of current progress in progress.
pt

]]>
by: debasish mitra //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12182 tue, 12 mar 2013 05:34:44 +0000 //www.deco-dalles.com/?p=979#comment-12182 it’s really good to see it.
how i can get the number of inprogress projects under each stages ?

]]>
by: debasish mitra //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12181 tue, 12 mar 2013 05:26:38 +0000 //www.deco-dalles.com/?p=979#comment-12181 how i can use the filter to see how many projects are in progress under each stages ?

]]>
by: naveen //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12180 tue, 19 feb 2013 11:25:58 +0000 //www.deco-dalles.com/?p=979#comment-12180 mr.micheal, just to add a piece to your explanation, u can user the attribute “remaining early start” to filter out all the activities in progress.

hope it helps.

regards,
naveen talla

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12179 mon, 18 feb 2013 14:42:04 +0000 //www.deco-dalles.com/?p=979#comment-12179 @nikhil
thanks for reaching out. you can adjust how labor hours are spread out over the duration of each activity. by default, p6 spreads all labor hours linearly over the duration of an activity. if you want to manually set the spreads (which is called bucket planning in p6 documentation), you can do this by using the resource usage spreadsheet (view -> show on bottom -> resource usage spreadsheet). configure the columns to show budgeted or planned labor hours. you can edit the allocations on the spreadsheet on the bottom right of the screen. this will be a topic for a future tutorial.
hope that helps.
warmest regards,
michael

]]>
by: nikhil //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12178 mon, 18 feb 2013 04:07:42 +0000 //www.deco-dalles.com/?p=979#comment-12178 i am new to primavera and working on a schedule for a project, i have completed assigning 世界杯时间比赛时间 to the activities, but now i have a problem, the s curve is not accurate , in need to get it in proper shape i need to adjust the units distributed in the activites , but i am not able change the units , so can you help me figure out a way out of this.

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12177 tue, 15 jan 2013 14:15:20 +0000 //www.deco-dalles.com/?p=979#comment-12177 @santhy
if you use custom dates, then you can specific a specific date range like “jan 1” for value and “jan 14” for high value. there is no formula when using custom dates in filters in p6. hope that helps.
michael

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12176 tue, 15 jan 2013 14:12:52 +0000 //www.deco-dalles.com/?p=979#comment-12176 @amir – 1) have you added the activity code your layout as a column? check the “codes” tab for some activities on the activities screen – does it exist there?
2) what data is missing that you would like to filter by?

]]>
by: amir kia //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12175 sat, 12 jan 2013 20:47:25 +0000 //www.deco-dalles.com/?p=979#comment-12175 your comments : thanks michael, i have two questions and appreciate of your response, 1- when i copy and paste a file in project or eps mode, while opening the file, it seems activity code is missing? 2- filter windows doesn’t show all data that we need to filter it.

amir

]]>
by: santhy //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12174 sat, 12 jan 2013 12:39:13 +0000 //www.deco-dalles.com/?p=979#comment-12174 nice tutorial sir.. could you please emphasize more the use of custom date, custom month…. how about i want to filter the date i prefer up to 2weeks… how to do it? thanks and more power

]]>
by: mohammed umer //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12173 sun, 30 dec 2012 16:44:57 +0000 //www.deco-dalles.com/?p=979#comment-12173 i learn soo many things from your free tutorial

thank you

]]>
by: precious //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12172 sat, 08 dec 2012 00:06:34 +0000 //www.deco-dalles.com/?p=979#comment-12172 as a beginner in the use of primavera, i really enjoyed the tutorial. excellent presentation!

thank you michael.

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12171 mon, 03 dec 2012 21:31:29 +0000 //www.deco-dalles.com/?p=979#comment-12171 osman,

everything in this tutorial still applies. but where you see “dd+1m” change it to “dd+3w”. there you go!
michael

]]>
by: osman //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12170 sun, 02 dec 2012 08:26:13 +0000 //www.deco-dalles.com/?p=979#comment-12170 great way of explaining !!

i would like to know how will we send a 3 weeks look ahead report ????i mean how do we create one ????

thanks in advance !

regards ,
osman

]]>
by: sabeel m //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12169 tue, 16 oct 2012 07:48:36 +0000 //www.deco-dalles.com/?p=979#comment-12169 very helpful tips

thanka alot

]]>
by: maas //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12168 tue, 10 jul 2012 05:14:09 +0000 //www.deco-dalles.com/?p=979#comment-12168 fantastic 100% tutorials on filters. the way of presentation is superb, vry easy to understand

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12167 thu, 07 jun 2012 12:42:08 +0000 //www.deco-dalles.com/?p=979#comment-12167 in reply to bob evans.

hi bob,
thanks for the feedback.
what shows up in the “is” dropdown depends on what is in the previous dropdown (parameter). it seems like you may not have a date field set or showing in the parameter dropdown. in the tutorial, we set “start” (which is the activity start date) in the parameter field. i would check the parameter dropdown to see if a date is set there. let us know if that helps.
warmest regards,
michael

]]>
by: bob evans //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12166 thu, 07 jun 2012 05:36:16 +0000 //www.deco-dalles.com/?p=979#comment-12166 you have an nice website michael. good ideas. can you help me? i only have three options on the filter is parameter, equals, is not equal to and, is under. how can i get the other lines to appear, especially, “within/not within range”?

bob

]]>
by: michael lepage //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12165 fri, 04 may 2012 13:01:42 +0000 //www.deco-dalles.com/?p=979#comment-12165 in reply to adil ahmed.

thanks for the great feedback adil!

]]>
by: adil ahmed //www.deco-dalles.com/build-lookahead-filters-primavera-p6/#comment-12164 thu, 03 may 2012 19:54:16 +0000 //www.deco-dalles.com/?p=979#comment-12164 fantastic tutorials on filters. the way of presentation is superb, vry easy to understand

]]>