comments on: compress a schedule using duration types in primavera p6 - 瑞士vs喀麦隆足彩赔率 //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/ project controls training & courses fri, 18 oct 2019 14:28:26 +0000 hourly 1 by: manoj unnikrishnan //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-37885 sat, 13 feb 2016 05:57:56 +0000 //www.deco-dalles.com/?p=31055#comment-37885 dear mr. michael lepage,
i am having a baseline schedule of about 15,000 activities which is being updated on a weekly basis. the programme is resource loaded and cost loaded. the programme shows 65% complete. i am using the fixed duration & unit as duration type. now i have to prepare a revised schedule using the latest update of this programme. i have to resequence the remaining works. the problem i am facing is that there are many activities with remaining duration of 1 to 2 days and percent complete of 90 to 98 %. please can you advise how to increase the remaining duration of the in-progress activities without changing the percentage completion?

]]>
by: alisher //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-28450 wed, 24 jun 2015 14:01:11 +0000 //www.deco-dalles.com/?p=31055#comment-28450 good day, dear mr. michael lepage!
my name is alisher, i am from tashkent. i work as specialist of planning and reporting group kandym early gas project in enter engineering pte ltd. i have same questions regarding primavera.
1. critical path way (how to make right analysis of schedule, how to decrease critical path way)
2. schedule options: about functions: total float less than or equal to, longest path and compute total float as ff=lf-ef….
3. global change ( in which way, cases we can use these functions )
4. activity usage spreadsheet: how to divide the project volume (physical work scope) day by day according to planning date. thank you for your attention.

]]>
by: michael lepage //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-28231 tue, 16 jun 2015 16:06:31 +0000 //www.deco-dalles.com/?p=31055#comment-28231 iftikhar,
good catch on that. it turns out that p6 behaves the same, recalculating the duration, whether you use “fixed units” or “fixed units / time”. i believe both are valid in this situation. however, i will make a note in the post on this to ensure there is no confusion.
thanks!
michael

]]>
by: iftikhar awan //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-28195 mon, 15 jun 2015 18:29:50 +0000 //www.deco-dalles.com/?p=31055#comment-28195 hi michael,

in step 2 above, probably you meant that duration type should be set to ‘fixed units’?
the amount of work (or units) on the four activities is fixed and we want to crash their duration by adding more 世界杯时间比赛时间 (thereby increasing the budgeted units/time). hence, number of units/time is not fixed but total number of units are.

thanks!

]]>
by: michael lepage //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-27941 mon, 08 jun 2015 13:56:49 +0000 //www.deco-dalles.com/?p=31055#comment-27941 in reply to hani.

hani, maybe i should clarify – this post was by no means a complete solution to compressing an entire schedule. just a tip for compressing a section relating to increased productivity by adding 世界杯时间比赛时间 . i would advise to do the same things you have listed here.

]]>
by: ahmad abubaker //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-27899 sun, 07 jun 2015 18:20:28 +0000 //www.deco-dalles.com/?p=31055#comment-27899 i am afraid the project is convert to rush project
how i can make control on the quality
i can jain quantity and accelerate but the maximum of quality is average
how i can solve this proplem ?

]]>
by: hani //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-27891 sun, 07 jun 2015 15:49:58 +0000 //www.deco-dalles.com/?p=31055#comment-27891 thanks michael to your post. to add to this, acceleration or crushing the schedule has to have few steps that should be done ahead. 1. we need to identify the critical path and crush the activities on that path only. activities that are not on the critical path, reducing there duration will not be shorten the project duration, 2. find the near critical path if any, 3. conduct time cost analysis or tradoffe to see which activity shorten the project duration lower cost.

]]>
by: islam katta, aciarb //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-27888 sun, 07 jun 2015 14:01:07 +0000 //www.deco-dalles.com/?p=31055#comment-27888 hi again mr michael lepage,
based on your experience, kindly provide me with some planning and control tips about a huge health campus project constituted by a group of hospitals in a very tight time with a lot of procurement uncertainties.
very truly yours
islam katta
project controls manager

]]>
by: islam katta, aciarb //www.deco-dalles.com/schedule-compression-using-duration-types-primavera-p6/#comment-27887 sun, 07 jun 2015 13:55:02 +0000 //www.deco-dalles.com/?p=31055#comment-27887 dear mr michael lepage
thanks a lot for your very significant email
best regards
islam katta
project controls manager
etlik health campus project -turkey

]]>