duration: 60 minutes
cost: free
tyler konter joined the engineering consulting industry after years of experience performing project management, engineering, project
controls, cpm scheduling, and cost analysis on live construction projects. mr. konter has performed and critiqued forensic analyses of industry-recognized methods including the measured mile for productivity analysis; and the contemporaneous, impacted as-planned, and as-planned vs. as-built for schedule analysis.