{"id":57928,"date":"2024-11-26t10:49:37","date_gmt":"2024-11-26t15:49:37","guid":{"rendered":"\/\/www.deco-dalles.com\/?post_type=case-study&p=57928"},"modified":"2024-12-05t11:25:09","modified_gmt":"2024-12-05t16:25:09","slug":"nkt-plan-academy-key-planning-p6-knowledge","status":"publish","type":"case-study","link":"\/\/www.deco-dalles.com\/case-study\/nkt-plan-academy-key-planning-p6-knowledge\/","title":{"rendered":"nkt: 世界杯2022亚洲比赛时间 was key to increase planning and p6 knowledge"},"content":{"rendered":"

nkt does complex work – chpe project<\/strong><\/h4>\n

the champlain hudson power express is an electric power supply initiative to facilitate the transmission of sustainable hydropower from canada to new york city. the 1,250-megawatt transmission line is one of the largest infrastructure investments in new york city\u2019s history and will contribute to the state\u2019s ambition for at least 70% of electricity generation and consumption to come from renewable energy sources by 2030<\/strong>. the champlain hudson power express (chpe) project<\/a> includes the manufacture and supply of submarine cable, onshore cable, and accessories for a route from the u.s.-canada border in the northern united states (the state of ny) down to new york city (queens).<\/p>\n

the champlain hudson power express route has been carefully designed to minimize its impact on the environment. burying the line keeps it out of sight and also protects it from extreme weather. the project will utilize waterways, existing roads, and railroad rights of way to remain out of sight. it will also be avoiding environmentally sensitive areas near the former ge hudson river plant and the protected sturgeon habitat in haverstraw bay. two five-inch-diameter cables will be placed underwater or underground and run 339 miles from the u.s.-canadian border, south through lake champlain, along and under the hudson river, and eventually ending at a converter station that will be built in astoria, queens.<\/p>\n

nkt<\/a> needs to produce what will be installed, and every high voltage cable is a unique, project specific product that has never been done before. what nkt does, based on client specifications, over the average span of five years, design the new cable, produce a small quantity, test it, and if the cable sample withstands all tests, we go into production, then we install it and finally we commission it.<\/strong><\/p>\n

alessandro parisi, nkt head of project planning – supply chain hv solutions division, narrates nkt’s values with project planning, employee development, and his department’s experience with 世界杯2022亚洲比赛时间 .<\/p>\n