{"id":55479,"date":"2023-04-25t10:34:44","date_gmt":"2023-04-25t14:34:44","guid":{"rendered":"\/\/www.deco-dalles.com\/?p=55479"},"modified":"2024-04-02t15:37:48","modified_gmt":"2024-04-02t19:37:48","slug":"scenarios-in-primavera-p6-heres-a-better-alternative","status":"publish","type":"post","link":"\/\/www.deco-dalles.com\/scenarios-in-primavera-p6-heres-a-better-alternative\/","title":{"rendered":"creating scenarios in primavera p6? here’s a better alternative"},"content":{"rendered":"
we have been creating scenarios in primavera p6 the same way for so long – and it completely sucks! here\u2019s what i’m talking about.<\/p>\n
let’s look at a project and say we want to add a second crew, or maybe change the way the project is starting. these actions are next to impossible to implement in a tool like primavera p6.<\/p>\n
let’s dive into this example below. this is a water main project where i am tunneling and need to sink new shafts – i have three shafts and two tunnels between each. now, let’s say i wanted to look at my excavation crew. this is the shaft. this is the digging area of shafts where i’m going to put the tbm in a tunnel from one shaft to the next. and i have to do three of these.<\/p>\n